
office (08) 9459-4149
fax (08) 9459-7178
freecall 1800-041-061
Innovative ROPS/FOPS Solutions & Water Carts
First and foremost "Is your ROPS/FOPS
certified to Australian Standards?"
Yes - all our designs are tested to destruction before
certification as per AS2294 & ISO3471:2008. Test procedure
assessed by independent firm
Hightech
Labs.
"Is your ROPS readily removable for
servicing or easy replacement?"
Although initial installation necessitates stripping of the
chassis and reinforcing with plate, removal (should it ever be
required) is a simple process.
"How strong is your ROPS?"
The simple answer - "IT's NOT". A ROPS frame
needs to absorb energy so it needs to deform or collapse in a
collision. Our designs allow this to occur without placing undue
stress on the truck itself. In most minor incidents a replacement
frame can be ordered to bolt directly to the original mounts.
"How much load space is required to fit
it?"
Our medium and heavy duty mounting system requires 350mm of
chassis space. We do however endeavour to keep this as close to or
partially under the cab to maximise the remaining load space.
"Will this increase my overhead
clearance?"
To varying degrees, yes. On fixed cab/bonnet design trucks
the increase will be approx 200mm but on tilt forward type cabs the
need for extra clearance means the ROPS frame will sit some
500-600mm higher than roof level. If however this is an issue for
your site, we can offer you hydraulic or manual "Folding" ROPS
frames that will lift out of the way when required bringing
clearance back down to ~200mm above roof level.
"Stand alone or integrated with Water
Cart or Tray?"
Integrated ROPS designs work well and can cut costs
initially, but you may run into problems when it comes time to
recertify the ROPS frame. To pass certification a ROPS needs to be
free from structural damage or rust. Will your slurry engulfing
water cart or much abused tray be in such a pristine condition after
a few years? This is one of the reasons why we have kept our
products separate.
"Turn around time?"
By keeping all stages of production and fitting in-house, we
have been able to keep our turnaround times amongst the lowest in
the business. Nobody wants to be without such an asset for any
extended period. At present our turnaround times on standard 2 post
ROPS/FOPS are 4-7 working days.

ROPS Modelling